Studio Apartments
Status
Completed
Project Type
Building
Project Area
26,346.74 Sq. Ft.
Commencement date
28 Jun, 2021
Price Range
$10k – $1.9M

Project description
Our Studio Apartments are the optimal investment entry point for generating high, consistent rental yields with minimal risk and low capital commitment. Designed with efficient, open-plan layouts, these units perfectly cater to the surging demand from young professionals, digital nomads, and single occupants who prioritize prime urban location and convenience over expansive space.
Studio units consistently outperform larger properties in terms of cash-on-cash returns due to their lower initial purchase price and minimal maintenance/utility costs. We strategically position these assets near business hubs and transport links, ensuring year-round high occupancy and making them the most liquid and reliable residential asset in a diversified investment portfolio.
Key Details
- Location: Nairobi, Kenya
- Total Built-Up Area:350,000 sq. ft.
- Number of Floors: 20, including two underground levels for parking.
- Special Features: Vertical garden facade, collaborative workspaces, and an energy-efficient HVAC system.
- Amenities: Gym, café, daycare, and rooftop event space.
Features & amenities
24x7 Security
Continuous, round-the-clock personnel and perimeter monitoring to ensure the safety and peace of mind of all residents and tenants.
Surveillance System
Comprehensive network of high-definition cameras strategically placed to monitor common areas, entrances, and parking for enhanced security coverage.
Fitness Center
A fully equipped, on-site gym featuring modern exercise machines and weights for convenient, healthy living without leaving the premises.
Children's play area
A safe, dedicated, and engaging outdoor space with modern equipment designed for children to play and socialize securely.
24 hour maintenance
Guaranteed availability of skilled staff 24 hours a day to address urgent property repairs and common area issues immediately.
Swimming Pool
A refreshing, professionally maintained on-site pool providing residents with an exclusive leisure and recreation space.
Firefighting System
An integrated network of alarms, sprinklers, and emergency equipment designed to rapidly detect and suppress fire hazards for maximum safety.
Landscape Garden
Professionally designed and maintained green spaces that enhance the property's aesthetic appeal, offering residents a tranquil, natural environment.
Location
address
Key transport
Coast
300m
University
750m
Supermarket
500m
Park
1120m
Railway station
1750m
Airport
3158m
Bus station
450m
Bank
415m
Hospital
350m
